ABOUT THE PROJECT

Another Amazon project in the books. Partnering with Ledcor Group, we took on the engineering, fabrication, and installation of insulated, prestressed precast panels for this massive single-story facility. The panels were designed as composite panels to eliminate the need for any mid-girt structure. They provided a clear span from foundation to roof structure, reaching a maximum height of 45' 6" and providing an impressive R20 insulation value. With both durability and thermal efficiency, our panels were the perfect fit for creating a solid, and energy-efficient exterior cladding. The panels were stained on-site after installation with Amazon’s specific branding. 

 

After the initial installation was complete, Amazon requested an extra overhead door opening. No problem! Our team modified the existing setup, removed a panel, and installed a new one with a door opening. From start to finish, production for this project was 15 weeks, and installation took just over 4 weeks. All in all, the Amazon DYT3 project really showcased the benefits of using Central Precast’s insulated precast panels to meet demanding project needs with speed, strength, and versatility.

Category
Panels
Tags
Amazon, Central Precast, Precast Concrete Solutions, Precast Panels, Thermowall Panels