Ciena
Kanata, ON
2015/2016
Contractor: Broccolini
Engineer: Clelande Jardine Engineering Ltd.
Architect: Pye & Richards Architects Inc.
Construction Managers: MHPM Construction Managers
Ciena needed more office space and wanted their two new buildings to have the same design and cladding as the first building they’d purchased. Since Central Precast had supplied the precast architectural panels (cladding) on the original building, the company was an obvious choice for Ciena. Central Precast engineered, manufactured and installed the new architectural panels (cladding) in standard beige with a light sandblast finish, perfectly matching the design of the original building. Central Precast met the project timeline of the client, with production of the panels taking about 8 weeks, and installation taking about 30 days per building.